Full design works for Al-Azhar Educational Hospital Assiut of 500 beds – 250 beds (7 buildings)
Design, Tender documents, detailed shop drawings and supervision for Architecture, Civil, Electro/Mechanical and Medical works for Assiut Educational Hospital, Al-Azhar University
