Alexandria Growth Pole Project Enhanced Wastewater Treatment System, Lake Marriout
ALDAR, Consulting Engineers was a member of the Holding Company for Water and Wastewater team for the revision of the proposed study aiming to minimize and reduce pollution generated and discharged to Marriout Lake by the primary treated wastewater treatment plant “Eastern and Western” of capacities over 1.5 million m3/d
